ANALISIS PANJANG ANTRIAN BERDASARKAN MIKROSIMULASI PADA SIMPANG BERSINYAL
(Iin Irawati, Diah Setiati Budiningrum)
DOI : 10.26623/teknika.v13i2.1313
- Volume: 13,
Issue: 2,
Sitasi : 0 23-Oct-2018
| Abstrak
| PDF File
| Resource
| Last.09-Jul-2025
Abstrak:
AbstractThe accuracy of capacity evaluation at signalized intersections is an important component in planning, design, operations and management of urban road networks. In analysis, a guide or manual is needed that is relevant to existing traffic conditions. One method that can be used to analyze signal intersections is the method of microsimulation. The microsimulation method used is VISSIM simulation. The intersection was chosen as the survey location, namely the Tlogosari - Semarang intersection which has 5 intersection arms. From the results of the analysis obtained the queue length 177.98,180.25, 179.34,180.47 meters.Keywords: queue length, microsimulation, signal intersection, VISSIMAbstrakKetepatan evaluasi kapasitas pada simpang bersinyal merupakan komponen penting dalam perencanaan, desain, operasional serta manajemen terhadap jaringan jalan perkotaan .Dalam analisis dibutuhkan suatu pedoman atau manual yang relevan dengan kondisi lalulintas yang ada. Salah satu metode yang dapat digunakan untuk menganalisis simpang bersinyal adalah metode mikrosimulasi. Metode mikrosimulasi yang digunakan adalah dengan simulasi VISSIM. Simpang terpilih sebagai lokasi survei yaitu simpang Tlogosari Semarang yang memiliki 5 lengan simpang. Dari hasil analisis diperoleh panjang antrian 177.98,180.25, 179.34,180.47 meter.Kata kunci; panjang antrian, mikrosimulasi, simpang bersinyal, VISSIM
|
0 |
2018 |
An Analysis Of Students Comprehension Level On Myob Accounting-Based Accounting Application (A Study In Accounting Students In Semarang Municipality)
(Tri Rinawati)
DOI : 10.26623/ebsj.v1i2.927
- Volume: 1,
Issue: 2,
Sitasi : 0 01-Oct-2018
| Abstrak
| PDF File
| Resource
| Last.09-Jul-2025
Abstrak:
<p class="Abstract">Accounting computerization students are taught to have accounting information system mindset, to apply, review, and develop the science underlying accounting information system engineering thoroughly. In addition to mastering several applications in accounting field, students also know how a software accounting works. Students of this department are taught to be experts in computer system be it software and hardware, particularly in accounting computer field.</p><p class="Abstract">The population in this research is S1 and DIII students of Accounting department at universities and colleges in Semarang Municipality with some considerations. The sample is taken using Purposive Sampling. Meanwhile, the data are collected by distributing questionnaire. The data analysis method used is difference test with Independent Sampel t Test, where this test is employed to figure out whether or not there is a mean difference between two unrelated sample groups.</p><p class="Abstract">There is indeed a difference in students comprehension on the initial data input, transaction recording and financial statements preparation. From the mean rank values of the three variables, it can be seen that students from Diploma program understand initial data input, transaction recording and financial statements preparation better than students from Bachelor program. This is because students from Diploma program receive more lessons on accounting both theoretically and practically, thus they understand the topics better.</p>
|
0 |
2018 |
NTT DALAM CAHAYA ACTOR NETWORK THEORY: Studi Kasus Human Trafficking Berkedok Pengiriman Tenaga Kerja Indonesia di Nusa Tenggara Timur
(Windy Paskawati Suwarno, Pamerdi Giri Wiloso, Wilson M.A. Therik)
DOI : 10.24246/kritis.v27i2p107-135
- Volume: 27,
Issue: 2,
Sitasi : 0 14-Sep-2018
| Abstrak
| PDF File
| Resource
| Last.07-Jul-2025
Abstrak:
The case of human trafficking in NTT has become an unresolved case. Most of the case of human trafficking in NTT are migrant workers. Human trafficking cases are effected by the actors involved in the network of problems. ANT (Actor Network Theory) is used as a review to describe the various roles of actors in human trafficking networks and is used to find the point of problem of human trafficking cases in NTT. The results of this study indicate an indication of the onvolvement of actors of human trafficking groups participating in trafficking networks. And poverty is a major factor in the rise and fall of human trafficking in NTT. And the poverty is a major factor in the unstoppable of human trafficking in NTT. The results of this study also led to the solution of economic empowerment as a way out of poverty to end human trafficking cases in NTT.
|
0 |
2018 |
The Impact Of Self-Actualization And Compensation Towards Multipurpose Cooperative Managers Work Performance In Semarang
(Nunik Kusnilawati, Haris Murwanto, Teguh Ariefiantoro)
DOI : 10.26623/ebsj.v2i1.1176
- Volume: 2,
Issue: 1,
Sitasi : 0 01-May-2018
| Abstrak
| PDF File
| Resource
| Last.09-Jul-2025
Abstrak:
<p><em>Article 33 of the 1945 Constitution of the Republic of Indonesia puts the cooperative as the pillar of our national economy. However, its contribution to national economy is hardly significant due to several constraints; among them is human resources.The purpose of the study is to analyze the impact of self-actualization and compensation towards the working performance of multi-purpose cooperative managers by using quantitative approach.</em><em> </em><em>This research used purposive sampling technique and collected a sample of 114 multi-purpose cooperative manager of 168 population using. Binary regression is used in descriptive statistics test.The results show that both self-actualization and compensation have significant influence towards the working performance of multi-purpose cooperative managers in Semarang.</em></p>
|
0 |
2018 |
Human Resources As A Factor Supporting The Success Of The Cooperation Sister City Semarang-Brisbane
(Albert Albert, Thomas Budi Santoso, B Irmawati)
DOI : 10.26623/ebsj.v2i1.1595
- Volume: 2,
Issue: 1,
Sitasi : 0 12-Apr-2018
| Abstrak
| PDF File
| Resource
| Last.09-Jul-2025
Abstrak:
<p><em>S</em><em>ister city collaboration is an activity carried out based on cooperation agreements between city governments in Indonesia and city governments abroad to mutually improve relations of friendship and understanding between the two countries. The Semarang Government on 11 January 1993 signed the first Sister City Memorandum of Understanding (MoU) with Lord Mayor Brisbane, Queensland, Australia. Unfortunately, this MoU of cooperation was halted in 2005, and although the MoU was still ongoing the implementation of the program activities stopped in 1997. The results of previous studies showed several factors as factors supporting the success of sister city cooperation. One of the supporting factors is the factor of human resources</em><em> (HR)</em><em>. The purpose of this study is to identify aspects of the human resource factor that can support the success of the Semarang-Brisbane sister city activity.</em></p><p><em>Primary data collection in this study was in the form of a questionnaire and interview to eight respondents from various backgrounds. The analysis in this study was carried out using descriptive analysis to describe the opinions of respondents about human resource factors that support the success of Semarang-Brisbane sister city.</em></p><em>The results of the study show that the important HR competency factors are those who have an understanding of the culture and language of the partner countries. Whereas according to its importance the competence of human resources is mastering English or other relevant languages, understanding partner countries, experts in the field of international agreements and mastering foreign policy.</em>
|
0 |
2018 |
Analyzing the Impact Of Traditional Market Relocation In Surrounding Traders And Communities (Case Study Of Demak Mranggen Markets)
(Anitiyo Soelistiyono, Andhy Tri Adrianto, Emaya Kurniawati)
DOI : 10.26623/ebsj.v2i1.1258
- Volume: 2,
Issue: 1,
Sitasi : 0 01-Apr-2018
| Abstrak
| PDF File
| Resource
| Last.09-Jul-2025
Abstrak:
<p>Traditional markets are markets that are built and managed by local governments. Relocation of a transfer of supporting facilities and infrastructure activities from one place to another in order to enhance the security, comfort and legality factors.Mranggen traditional market is one of the markets located in the village of Mranggen which is increasingly experiencing an increasing number of traders. For this reason, the Demak Regency Government decided to relocate the market, one of them is the traditional Mranggen market, the government's purpose of relocating Mranggen's traditional market to tidy up the former market which had not been neatly arranged. Mranggen's market relocation had an impact or pros and cons for traders and the surrounding community. The problem in this study is the impact of market relocation of Mranggen's traditional market relocation to traders in the surrounding community. The aim of the study was to determine the impact of Mranggen's traditional market relocation to both traders and the surrounding community with market relocation.</p><p>The research design used in this study is a holistic single case study. This study uses a qualitative approach. The types and sources of data used in this study are primary data and secondary data. The object of the research was conducted at the temporary shelter of Mranggen village. Informants are traders and communities around the shelter. Data collection techniques with triangulation.As for eclectic data analysis techniques. In this study, the validity of the research data was tested by credibility, transferability, dependability test, and confirmability test.</p><p>The results of our research on the impact of relocation on product quantity is the reduction in product quantity ranging from 30% to 50%. With regard to operating hours the impact of this relocation is a reduction in operating hours of only 6-8 hours per day. For the position of the stall The inconvenience of the stall position, the stinging smell of garbage, and when the rainy season often floods and lacks security. In terms of ease of reaching the location, the traders complained about the location of the remote relocation and the narrow road to relocation which affected the consumers' desire to buy. With this relocation, sales turnover has decreased from 75,000-250,000/day.</p>
|
0 |
2018 |
Analysis Of Profits And Feasibility Of The Tempe Household Tempe Crafts Manufacturer In Lamper Tengah Village, Semarang Selatan District
(Rita Meiriyanti, Tri Rinawati, Witjaksono Eko Hartoto)
DOI : 10.26623/ebsj.v2i1.2422
- Volume: 2,
Issue: 1,
Sitasi : 0 01-Apr-2018
| Abstrak
| PDF File
| Resource
| Last.09-Jul-2025
Abstrak:
<p><em>A small industry has a strategic role in driving the economy. One of the potential small industries to be developed is the tempe industry. This study aims to analyze the benefits and feasibility tempe crafts manufacturer in Lamper Tengah Village, Semarang Selatan District which is the largest tempe industry area in Semarang City so that the results of the analysis can be taken into consideration to further develop their business.</em></p><p><em>This research design uses quantitative methods. This research is a case study so business owners making tempeh in Semarang City is used as a source to obtain information needed in research. The data used are primary and secondary. Data collection techniques carried out by interview, observation, and recording. Data obtained analyzed using profit analysis <em>Ï€ = TR-TC </em>and to find out business feasibility using the formula <em>R / C </em>Ratio.</em></p><p><em>The results of this study indicate that the average total cost incurred by tempe producers in Lamper </em><em>Tengah Village</em><em> per month is Rp 16,916,210.70. The average amount of tempe produced was 18,108 packs with an average price of Rp. 2,500, so that the average monthly income earned by tempe craftsmen is Rp 45,270,556 and the average profit gained is Rp 28,354,355. The business of making soybean tempe has an efficiency value of 2.68, meaning that every one rupiah the costs incurred will get an income of 2.68 times the cost incurred, then the tempe industry business in </em><em>Lamper Tengah</em><em> </em><em>Village </em><em>is feasible to continue and can even be invested in industrial development the tempe.</em><em></em></p><p><strong><em>Keywords</em></strong><em>:</em> <em>Profit, Business Feasibility, Tempe Crafts</em><em> Man</em><em>ufacturer</em><em></em></p>
|
0 |
2018 |
SISTEM INFORMASI PENGELOLAAN PERSEDIAAN BAHAN BAKU BERBASIS CLIENT SERVER PADA CV. ALINEA JAVA SEMARANG
(Rini Rubhiyati, Retno Lestianawati)
DOI : 10.51903/jtikp.v9i1.163
- Volume: 9,
Issue: 1,
Sitasi : 0 06-Mar-2018
| Abstrak
| PDF File
| Resource
| Last.23-Jul-2025
Abstrak:
Abstract The management of raw material inventory is a very important part for a company. In the process of inventory management of raw materials conducted on CV.Alinea Java until now still using conventional system using Microsoft Excel 2007, starting from material estimation, ordering process of goods to supplier, process of receipt and expenditure of raw materials, raw material returns, addressed to the leadership and related sections. And the utilization of wireless networks that are less effective because only connected computer warehouse administration and purchasing, not all users, to overcome the above problems, it is necessary information that utilizes the inventory management information system raw materials with computer network based client server using a new system of mutual terintregrasi all users so that all interested parties can access the desired data of course with certain restrictions, according to the status entered. Then created a system of inventory management information raw materials server client base on CV.Alinea Java by using Microsoft Visual Basic 6.0 and Microsoft SQL Server 2000 database that will assist in the process of data processing system.
|
0 |
2018 |
KAJIAN IMPLEMENTASI NILAI EMP SEPEDA MOTOR 0.15 BERDASARKAN HASIL PEMODELAN MIKROSIMULASI LALULINTAS UNTUK PERHITUNGAN KINERJA SIMPANG BERSINYAL
(Supoyo Supoyo, Iin Irawati)
DOI : 10.26623/teknika.v12i2.1617
- Volume: 12,
Issue: 2,
Sitasi : 0 23-Oct-2017
| Abstrak
| PDF File
| Resource
| Last.09-Jul-2025
Abstrak:
AbstrakManual Kapasitas Jalan Indonesia 1997 adalah sebuah produk penelitian yang dibentuk dari hasil analisis data tahun 1994, yang mengacu pada kondisi lalulintas saat itu. MKJI 1997 seharusnya didasarkan pada kondisi arus lalulintas yang relevan. Pada kenyataannya, kondisi tersebut tidak sesuai dengan hasil lapangan, sehingga MKJI 1997 diperlukan suatu revisi. Salah satu subastansi yang direvisi adalah besaran nilai EMP. Penelitian ini bertujuan untuk mengakaji implementasi hasil peneitian pada EMP sepeda motor pada simpang bersinyal, menggunakan metode simulasi lalulintas dengan bantuan software. Untuk membangun model simulasi lalulintas, diperlukan adanya suatu algoritma program. Angka 0.25 dalam MKJI 1997pada EMP sepeda motor dianggap tidak relevan dengan kondisi yang ada. Jadi diperlukan updating nilai. Dari hasil penelitian yang sudah dilakukan, didapatkan angka 0.15. Angka tersebut diimplementasikan dalam Metode MKJI 1997. Kata kunci : Ekivalen Mobil Penumpang; sepeda motor; MKJI, simpang bersinyal, panjang antrian.
|
0 |
2017 |
KNOWLEDGE GAP DAN ADAPTASI LINGKUNGAN KERJA KARYAWAN LOKAL DI HOTEL MILIK ASING
(Janio Abilio Madeira Soares, Titi Susilowati Prabawa)
DOI : 10.24246/kritis.v26i2p176-193
- Volume: 26,
Issue: 2,
Sitasi : 0 14-Oct-2017
| Abstrak
| PDF File
| Resource
| Last.07-Jul-2025
Abstrak:
This research is meant to explore how local employees who work in International hotels in Dili, the capital city of Timor Leste adapt to the working environment. Without enough knowledge about hospitality, they acquire the skills through the knowledge transfer from the senior workers and through learning by doing. This research uses qualitative approach. In order to obtain data, in-depth interviews were done with 16 employees of the two hotels under research, i.e., Novo Turismo Hotel and Timor Plaza hotel. The research finds that kinship value in their working environment helps to accelerate transfer knowledge for the employees in Novo Turismo Hotel dan Timor Plaza. The process brings positive effects to training fund, potentials of internal conflicts and the cost of damages caused by the negligence of local employees.
|
0 |
2017 |